I had a look at this, and added "high" next to the ones that I thought
were high, and realised it was all but two.
So I took the column out and moved those two to a 1.2 roadmap. Maybe we
can break that down into 1.2, 2.0, etc. as we go and just keep this page
as the "this is what we're doing a
it disappeared into the ether of the mailing list? :)
I still think its a good idea, thanks for bringing it back up...could
be very useful on some of the larger issues like security and project
groups, etc..
jesse
On 7/12/06, Rinku <[EMAIL PROTECTED]> wrote:
Hi,
Just wondering what happened
Hi,
Just wondering what happened to this idea:
http://www.nabble.com/2.1-Design-and-Process-tf1617559.html#a4383722
Cheers,
Rahul
Jesse McConnell wrote:
hi everyone,
I have been trying to help emmanuel some with pulling together the
roadmap for Continuum 1.1 on the wiki and maybe help organ
On 3/07/2006 7:17 PM, Jason van Zyl wrote:
So you're suggesting we not doing any official alpha/beta releases?
Right.
- Brett
--
Brett Porter <[EMAIL PROTECTED]>
Apache Maven - http://maven.apache.org/
Better Builds with Maven - http://library.mergere.com/
On 3 Jul 06, at 9:30 AM 3 Jul 06, Brett Porter wrote:
On 28/06/2006 8:40 PM, Jason van Zyl wrote:
When we last discussed it on the development process, we talked
about instead doing regular promotion of the automated builds
(eg, roughly once a week we say "this is a stable build with
some
On 28/06/2006 8:40 PM, Jason van Zyl wrote:
When we last discussed it on the development process, we talked about
instead doing regular promotion of the automated builds (eg, roughly
once a week we say "this is a stable build with something new/a good
fix/etc, let's ask people to test it").
I
Trygve Laugstøl a écrit :
+1 to most stuff, comments inline.
Emmanuel Venisse wrote:
Hi,
I started to define the roadmap of continuum 1.1. It will be done
normally tomorrow.
The major first things to do in this roadmap are:
- Reimplementation of authentication/authorization management
(
ok, I think the roadmap is done now. We have 159 issues.
I'll be happy if we can include all these issues in 1.1 :-)
Emmanuel
Emmanuel Venisse a écrit :
Hi,
I started to define the roadmap of continuum 1.1. It will be done
normally tomorrow.
The major first things to do in this roadmap are
- customization of the add project feature. In this part, I think
to add a multi-project as a multiple projects or as a single
project, scm connection string to use, add with a scm url, add all
modules by a scm connection instead of an url contruction based on
project url provided in the add sc
- Remove JDO (at least jpox) because it the source of lot of our
issues
+1
My only opinion on this is to think about it, but save the work until we
bump into the next big problem that is going to require a lot of effort
to fix. It seems stable enough in 1.0.3 and if it remains that way
thr
On 28 Jun 06, at 10:52 AM 28 Jun 06, Emmanuel Venisse wrote:
Jason van Zyl a écrit :
On 27 Jun 06, at 10:04 PM 27 Jun 06, Emmanuel Venisse wrote:
Hi,
I started to define the roadmap of continuum 1.1. It will be done
normally tomorrow.
Are we deciding that these are the things are going t
On 6/28/06, Emmanuel Venisse <[EMAIL PROTECTED]> wrote:
Jason van Zyl a écrit :
>
> On 27 Jun 06, at 10:04 PM 27 Jun 06, Emmanuel Venisse wrote:
>
>> Hi,
>>
>> I started to define the roadmap of continuum 1.1. It will be done
>> normally tomorrow.
>
> Are we deciding that these are the things a
Jason van Zyl a écrit :
On 27 Jun 06, at 10:04 PM 27 Jun 06, Emmanuel Venisse wrote:
Hi,
I started to define the roadmap of continuum 1.1. It will be done
normally tomorrow.
Are we deciding that these are the things are going to be in 1.1 and
take as long as we need? I would prefer that
On 27 Jun 06, at 10:04 PM 27 Jun 06, Emmanuel Venisse wrote:
Hi,
I started to define the roadmap of continuum 1.1. It will be done
normally tomorrow.
Are we deciding that these are the things are going to be in 1.1 and
take as long as we need? I would prefer that myself. Looking below
Hi,
I started to define the roadmap of continuum 1.1. It will be done normally
tomorrow.
The major first things to do in this roadmap are:
- Reimplementation of authentication/authorization management (CONTINUUM-542 and CONTINUUM-513):
this will be done by carlos with acegi. Carlos will integ