On Sun, Aug 07, 2016 at 09:46:26AM -0500, RD Beck wrote:
> The issue seems to have been introduced with 45.2.0-2+b1. I have another
> machine with 45.2.0-2 which works fine. The same version of
> calendar-google-provider was used.
I can also confirm that the wheezy version 1:45.2.0-2~deb7u1
The issue seems to have been introduced with 45.2.0-2+b1. I have
another machine with 45.2.0-2 which works fine. The same version of
calendar-google-provider was used.
On 08/05/2016 04:54 PM, RD Beck wrote:
I disabled all extensions, removed iceowl and calendar-google-provider
(purged it).
I disabled all extensions, removed iceowl and calendar-google-provider
(purged it). Installed iceowl, and icedove starts fine. Reinstalled
calendar-google-provider and get the segmentation fault.
3 matches
Mail list logo