[
https://issues.apache.org/jira/browse/HIVE-4420?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Owen O'Malley updated HIVE-4420:
Fix Version/s: (was: 0.12.0)
> HCatalog unit tests stop after a failure
> --
[
https://issues.apache.org/jira/browse/HIVE-4420?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Owen O'Malley updated HIVE-4420:
Fix Version/s: 0.11.0
> HCatalog unit tests stop after a failure
> -
[
https://issues.apache.org/jira/browse/HIVE-4420?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Alan Gates updated HIVE-4420:
-
Resolution: Fixed
Status: Resolved (was: Patch Available)
Thanks Sushanth.
> HCa
[
https://issues.apache.org/jira/browse/HIVE-4420?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Alan Gates updated HIVE-4420:
-
Status: Patch Available (was: Open)
> HCatalog unit tests stop after a failure
>
[
https://issues.apache.org/jira/browse/HIVE-4420?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Alan Gates updated HIVE-4420:
-
Attachment: HIVE-4420.patch
Attaching a patch that puts the tests in a parallel structure so that each one