In message 8fe0b56b86c54b74ba5b760e33552...@thhste15d1be4.hs20.net,
dated Sun, 23 Aug 2015, Charlie Blackham char...@sulisconsultants.com
writes:
The last scenario is the ?nasty? one ? there is a transition period
written into RED, but not into EMC or LVD, so equipment that is
currently
Scott
There are four scenarios for equipment within scope of RTTE and/or RED, and
the various transition periods have been clarified by the European Commission:
1. PRODUCTS WITHIN OLD LVD/EMCD AND CONTINUE TO BE WITHIN NEW LVD/EMCD (EVEN
AFTER APPLICABILITY OF RED)
-Products placed on
Hi guys,
I'm heading up the Compliance 101 Track for the 2016 Symposium in Anaheim, CA.
The Track was very well received last year and I'm hoping to do it again this
year with 6 or 7 presentations on high level compliance issues, tips and
teachings.
The audience for the Track are those new
In message 7b2a2bea1ed34fe39a16271030b46...@thhste15d1be4.hs20.net,
dated Sun, 23 Aug 2015, Charlie Blackham char...@sulisconsultants.com
writes:
The RED is not mandatory for anything within its scope until 12 June
2017 ? Low Frequency banded equipment is covered by the same transition
The RED is not mandatory for anything within its scope until 12 June 2017 - Low
Frequency banded equipment is covered by the same transition period as other
non-RTTE equipment such as TVs.
This is contained in article 48:
Article 48
Transitional provisions
Member States shall not impede,
John,
Thanx for speaking up; the symposium is always awsome.
I did the Electric Shock for Dummies pitch last year and had
a great group attending. I'm willing to do it again this year, building on
last years session with some improvements.
:)
6 matches
Mail list logo