Re: EMC test table construction plans

2001-11-05 Thread John Woodgate
I read in !emc-pstc that Michael Taylor mtay...@hach.com wrote (in 7798e57399e3d211b11600902762695205c15...@lvexch1.lvl.hach.com) about 'EMC test table construction plans', on Mon, 5 Nov 2001: We successfully used these woods in stands that were subjected to charge deposition in excess

RE: EMC test table construction plans

2001-11-05 Thread Michael Taylor
. For what it's worth. Michael Taylor Awaiting winter in Colorado -Original Message- From: Scott Lacey [mailto:sco...@world.std.com] Sent: Friday, November 02, 2001 5:04 PM To: POWELL, DOUG Cc: emc-p...@majordomo.ieee.org Subject: RE: EMC test table construction plans Doug, Wood is ok

RE: EMC test table construction plans

2001-11-03 Thread Brent DeWitt
Of Sundstrom Michael (NMP-RD/Dallas) Sent: Friday, November 02, 2001 7:09 AM To: 'Pommerenke, David'; 'POWELL, DOUG'; EMC-PSTC (E-mail) Subject: RE: EMC test table construction plans We use a styrofoam table here at our lab, it is a round plug of styrofoam 80cm tall and 1m across. This has worked

RE: EMC test table construction plans

2001-11-03 Thread Scott Lacey
...@majordomo.ieee.org [mailto:owner-emc-p...@majordomo.ieee.org]On Behalf Of POWELL, DOUG Sent: Thursday, November 01, 2001 12:38 PM To: EMC-PSTC (E-mail) Subject: EMC test table construction plans Hello all, I plan to construct my own insulated EMC test table for a 5 meter chamber. Seems simple enough to do

RE: EMC test table construction plans

2001-11-02 Thread Sundstrom Michael (NMP-RD/Dallas)
: RE: EMC test table construction plans Doug, For emissions and immunity you should not use any wood in the table. It will significantly (+/-2 dB up to 1 GHz for emissions , more above, +/-10 dB for immunity up to 1 GHz) change the test result. My experience has shown that Styrofoam is basicly

RE: EMC test table construction plans

2001-11-02 Thread Ehler, Kyle
To: doug.pow...@aei.com; emc-p...@ieee.org; davi...@ece.umr.edu Subject: RE: EMC test table construction plans David, On a similar note I had heard that an EUT shelter might demonstrate a 6 dB variation between wet and dry conditions, or dirty vs. clean (pressure cleaned) condition. Did

RE: EMC test table construction plans

2001-11-02 Thread Douglas_Beckwith
From: Douglas Beckwith@MITEL on 11/02/2001 08:21 AM Sorry guys, finger trouble here with a mouse, didn't mean to send a reply. Regards Doug Beckwith --- This message is from the IEEE EMC Society Product Safety Technical Committee emc-pstc discussion

RE: EMC test table construction plans

2001-11-02 Thread WOODS
To: 'POWELL, DOUG'; EMC-PSTC (E-mail) Subject: RE: EMC test table construction plans Doug, For emissions and immunity you should not use any wood in the table. It will significantly (+/-2 dB up to 1 GHz for emissions , more above, +/-10 dB for immunity up to 1 GHz) change the test result. My

RE: EMC test table construction plans

2001-11-02 Thread Pommerenke, David
it is even worse, as there is no maximization done. David Pommerenke -Original Message- From: John Woodgate [mailto:j...@jmwa.demon.co.uk] Sent: Friday, November 02, 2001 1:34 AM To: emc-p...@majordomo.ieee.org Subject: Re: EMC test table construction plans I read in !emc-pstc

RE: EMC test table construction plans

2001-11-02 Thread Douglas_Beckwith
for some interesting conversations. Ghery Pettit Intel -Original Message- From: POWELL, DOUG [mailto:doug.pow...@aei.com] Sent: Thursday, November 01, 2001 9:38 AM To: EMC-PSTC (E-mail) Subject: EMC test table construction plans Hello all, I plan to construct my own insulated EMC

Re: EMC test table construction plans

2001-11-02 Thread Robert Macy
: emc-pstc@listserv.ieee.org Date: Friday, November 02, 2001 2:30 AM Subject: Re: EMC test table construction plans I read in !emc-pstc that Pommerenke, David davi...@ece.umr.edu wrote (in 9da8d24b915bd1118911006094516eaf0ba31...@umr-mail02.cc.umr.edu) about 'EMC test table construction plans

Re: EMC test table construction plans

2001-11-02 Thread John Woodgate
I read in !emc-pstc that Pommerenke, David davi...@ece.umr.edu wrote (in 9da8d24b915bd1118911006094516eaf0ba31...@umr-mail02.cc.umr.edu) about 'EMC test table construction plans', on Thu, 1 Nov 2001: For emissions and immunity you should not use any wood in the table. It will significantly (+/-2

RE: EMC test table construction plans

2001-11-01 Thread UMBDENSTOCK
Umbdenstock Sensormatic -- From: Pommerenke, David[SMTP:davi...@ece.umr.edu] Reply To: Pommerenke, David Sent: Thursday, November 01, 2001 4:15 PM To: 'POWELL, DOUG'; EMC-PSTC (E-mail) Subject: RE: EMC test table construction plans Doug, For emissions

RE: EMC test table construction plans

2001-11-01 Thread Pommerenke, David
...@aei.com] Sent: Thursday, November 01, 2001 11:38 AM To: EMC-PSTC (E-mail) Subject: EMC test table construction plans Hello all, I plan to construct my own insulated EMC test table for a 5 meter chamber. Seems simple enough to do and I could easily come up with something. I thought I might

Re: EMC test table construction plans

2001-11-01 Thread Ron Pickard
Hi Doug, The following expresses some of my experiences. I plan to construct my own insulated EMC test table for a 5 meter chamber. Seems simple enough to do and I could easily come up with something. I thought I might first ask for input from those of you in the discussion group who have

Re: EMC test table construction plans

2001-11-01 Thread John Woodgate
I read in !emc-pstc that POWELL, DOUG doug.pow...@aei.com wrote (in b44016f6854cd511a6470003476b45e4381...@exchange.aei.com) about 'EMC test table construction plans', on Thu, 1 Nov 2001: 1) I will be testing products that weight up to 200 Lbs (91 kg). No problem 2) I want to minimize metalic

RE: EMC test table construction plans

2001-11-01 Thread UMBDENSTOCK
, Don Umbdenstock Sensormatic -- From: POWELL, DOUG[SMTP:doug.pow...@aei.com] Reply To: POWELL, DOUG Sent: Thursday, November 01, 2001 12:37 PM To: EMC-PSTC (E-mail) Subject: EMC test table construction plans Hello all, I plan to construct my own

RE: EMC test table construction plans

2001-11-01 Thread Pettit, Ghery
for some interesting conversations. Ghery Pettit Intel -Original Message- From: POWELL, DOUG [mailto:doug.pow...@aei.com] Sent: Thursday, November 01, 2001 9:38 AM To: EMC-PSTC (E-mail) Subject: EMC test table construction plans Hello all, I plan to construct my own insulated EMC test

EMC test table construction plans

2001-11-01 Thread POWELL, DOUG
Hello all, I plan to construct my own insulated EMC test table for a 5 meter chamber. Seems simple enough to do and I could easily come up with something. I thought I might first ask for input from those of you in the discussion group who have experience or maybe even construction plans. Here