I require, with notes on the parts drawings, that all fabricated or
molded flame rated plastic parts be UL Recognized Component. The
packaging the plastic parts are shipped in typically has a label
containing all of the information the UL inspector needs.
The UL ca
Hi Darrell et al,
Traceability is the key here. And, it is up to the manufacturer to implement
the process that works best and which also provides that traceability for the
inspectors when they visit. Getting the inspectors in-and-out quickly has
always been a goal because its better for
2 matches
Mail list logo