Re[2]: Plastics Cert Documentation

1998-11-19 Thread Jim Lyons
I require, with notes on the parts drawings, that all fabricated or molded flame rated plastic parts be UL Recognized Component. The packaging the plastic parts are shipped in typically has a label containing all of the information the UL inspector needs. The UL ca

Re[2]: Plastics Cert Documentation

1998-11-19 Thread ron_pickard
Hi Darrell et al, Traceability is the key here. And, it is up to the manufacturer to implement the process that works best and which also provides that traceability for the inspectors when they visit. Getting the inspectors in-and-out quickly has always been a goal because its better for