certain time? I'm not seeing any errors that could potentially stop the
test. Thanks!
Best,
-Alan
--
View this message in context:
http://www.nabble.com/Scheduler-Config-tp25910060p25910060.html
Sent from the JMeter - User mailing list archive at Nabbl
> include a duration time even though I set the time to start and end at a
> certain time? I'm not seeing any errors that could potentially stop the
> test. Thanks!
>
> Best,
>
> -Alan
> --
> View this message in context:
> http://www.nabble.com/Scheduler-Config-
tart and end at a
>> certain time? I'm not seeing any errors that could potentially stop the
>> test. Thanks!
>>
>> Best,
>>
>> -Alan
>> --
>> View this message in context:
>> http://www.nabble.com/Scheduler-Config-tp25910060p25910060.html
;> run a bunch of tests with 5 threads with only 1 loop. Do I need to also
> >> include a duration time even though I set the time to start and end at a
> >> certain time? I'm not seeing any errors that could potentially stop the
&
into trouble getting my scheduler to run on the Forever loop
>> with
>> >> 5
>> >> threads. It appears that it only runs thru the loop once. I had
>> >> initially
>> >> run a bunch of tests with 5 threads with only 1 loop. Do I need to
&g
09 at 7:53 AM, arubin41
> >> wrote:
> >> >
> >> >>
> >> >> Running into trouble getting my scheduler to run on the Forever loop
> >> with
> >> >> 5
> >> >> threads. It appears that it only runs thru the loop onc
n time even though I set the time to start and end
> at
> >> a
> >> >> certain time? I'm not seeing any errors that could potentially stop
> >> the
> >> >> test. Thanks!
> >> >>
> >> >
7 matches
Mail list logo