Hi,
I am writing to inform you all that we are 3 weeks from the Linux Tools
0.10 release and that new contributions from non-committers cannot be
accepted for this release (scheduled for March 23rd).
We need to make sure the IP Log process is fine, so please, review all
you bugs and make sure a
I am just writing to confirm that the 0.10 release will be done at March
23rd. We have a cut-off date for accepting patches from non-committers
for a release, so all patches from non-committers need to be applied
before March 9th.
The release plan was updated at
http://www.eclipse.org/projects/
* Otávio Pontes [2012-01-31 11:56]:
> On 01/31/2012 02:39 PM, Otávio Pontes wrote:
> >On 01/30/2012 12:46 PM, Andrew Overholt wrote:
> >I was thinking in a release for March 26th, two months from now and
> >between the 0.9 and 1.0 releases.
> >>
> >>I forgot that it's probably a good idea
On 01/31/2012 02:39 PM, Otávio Pontes wrote:
On 01/30/2012 12:46 PM, Andrew Overholt wrote:
I was thinking in a release for March 26th, two months from now and
between the 0.9 and 1.0 releases.
I forgot that it's probably a good idea to discuss this planned release
with technology-...@eclipse.
On 01/30/2012 12:46 PM, Andrew Overholt wrote:
I was thinking in a release for March 26th, two months from now and
between the 0.9 and 1.0 releases.
I forgot that it's probably a good idea to discuss this planned release
with technology-...@eclipse.org since it'll be crunch time for them and
th
On 01/28/2012 06:02 AM, akurtakov wrote:
Same for me.
On Sat, Jan 28, 2012 at 12:09 AM, Andrew Overholt wrote:
Hi,
I was thinking in a release for March 26th, two months from now and
between the 0.9 and 1.0 releases.
That's during EclipseCon which I am attending so as long as you can take
> >> I was thinking in a release for March 26th, two months from now and
> >> between the 0.9 and 1.0 releases.
I forgot that it's probably a good idea to discuss this planned release
with technology-...@eclipse.org since it'll be crunch time for them and
the Eclipse legal team and we'll have to g
Same for me.
On Sat, Jan 28, 2012 at 12:09 AM, Andrew Overholt wrote:
> Hi,
>
>> I was thinking in a release for March 26th, two months from now and
>> between the 0.9 and 1.0 releases.
>
> That's during EclipseCon which I am attending so as long as you can take
> care of the release, that works
Hi,
> I was thinking in a release for March 26th, two months from now and
> between the 0.9 and 1.0 releases.
That's during EclipseCon which I am attending so as long as you can take
care of the release, that works for me.
Andrew
___
linuxtools-dev mai
We were discussing in the thread 'Linux Tools 0.9.1 build' about a
possible 0.10 release before the 1.0 release scheduled for June.
I was thinking in a release for March 26th, two months from now and
between the 0.9 and 1.0 releases. And to release in this date we will
need to stop accepting c