Hi Sundar,
Thanks and yes I think these are the gist of our discussion during last
meeting :)
On Sun, Mar 18, 2018 at 12:40 PM, Nadathur, Sundar <
sundar.nadat...@intel.com> wrote:
> Hi Howard and all,
>
> Re. my AR to write a spec, please confirm the following:
> * Since the weigher is
Hi Howard and all,
Re. my AR to write a spec, please confirm the following:
* Since the weigher is part of the overall scheduling flow, I presume
the spec has to cover the scheduling flow that we hashed out in the PTG.
The compute node aspects could be a separate spec.
* Since there
Hi Team,
Here are the meeting summary for our post-ptg kickoff meeting.
0. Meeting recordings: https://www.youtube.com/watch?v=6AZn0SUC_hw ,
https://www.youtube.com/watch?v=-wE2GkSibDo ,
https://www.youtube.com/watch?v=E40JOm311WI
1. PoC from Shaohe and Dolpher (