Hi,
The idea is to eliminate Mondrian altogether, but as long as it is part of
Moose, its tests are important, so they will remain in the build.
But, in the meantime, I found the reason why the PetitSmalltalk tests were not
ran, and I fixed the problem (we are now running 3350 tests and have 19
11 failures (-17)
https://ci.inria.fr/moose/job/Moose-latest-dev-4.8/lastCompletedBuild/testReport/
:-)
Doru, if Mondrian tests are not really important, we can exclude it from
the build report?
And may be include petit-parser tests in the report or we can create a
different job for it?
usman
Hi,
The Moose build including running tests now works based on the NBCog VM and the
latest Pharo 2.0 (built on Ubuntu):
https://ci.inria.fr/moose/job/Moose-latest-dev-4.8/lastCompletedBuild/testReport/
There are 27 test failures.
I also tried on OS X using NBCog VM and the there is no crash. Th