On Apr 1, 2015, at 6:57 PM, Vince Skahan vinceska...@gmail.com wrote:
Thanks - for under 10 clients is 100GB for storage really needed ?Would
more like 50 be good enough ?
Sorry, I haven’t looked at the storage requirements.
Thinking of kickstarting up a centos7 host under qemu-kvm (on
On Tuesday, March 31, 2015 at 12:48:40 AM UTC-7, Brad Knowles wrote:
When running the eval copy of PE 3.7.2 on AWS, we have found that you can
boot the master if the VM is an m3.medium (3.5GB), but you run into memory
problems that cause the system to be unreliable. If we use m3.larges
On Mar 30, 2015, at 5:32 PM, Vince Skahan vinceska...@gmail.com wrote:
I have a 16-GB ram Intel NUC
(http://www.intel.com/content/dam/www/public/us/en/documents/product-briefs/nuc-kit-d54250wyk-product-brief.pdf)
running Centos7 and was thinking of spinning up some VMs to try this out.
geez puppet needs a 'lot' of oomph to spin up the first node
Evaluation Environment
An evaluation environment is run on a monolithic installation and is
suitable for evaluating PE on 250 or fewer nodes. We recommend that your
hardware meets the following:
- A 4-core server with 6 GB