Re: [RE-wrenches] Fronius monitoring

2009-03-10 Thread Karl Schwingel
I've used the wattnode with APRS' wind data logger to provide data logging for 20 K Jacobs and 10K bergey turbines, as there has never been real time data logging equipment for either of their inverters. we've been pretty happy with them. just plug in the equation for the voltage into your ex

Re: [RE-wrenches] Line Side Feed In and Disconnects

2009-03-10 Thread David Brearley
Wayne, As you suggested, because this is a new service, a PV service disconnect is required. The question of whether a second disconnect is required, a new disconnect for the main service, is a Code issue, as far as I can tell. It is also an interpretation, but I¹ll get to that later. It just so

[RE-wrenches] Stimulus Plan Info

2009-03-10 Thread roger dixon
AWEA's FAQ sheet addressing the Economic Stimulus Package states that for equipment to qualify for the 30% tax credit it must "generally" be new. Can anyone define this a bit better? Would anyone know if fully reconditioned and/or rebuilt units with full warranties qualify? Who makes the determ

Re: [RE-wrenches] Fronius monitoring

2009-03-10 Thread Mario F. Monesterio
William, In my case the full monitoring system was installed on a IG5000 three+ years ago, we also included the large display. All systems are functioning very well. I just wish the software allowed for a few more bells and whistles. Mario Monesterio Westwood Renewables, LLC St.Paul, MN C: 6

[RE-wrenches] solar path finder thermal program

2009-03-10 Thread Tom Lane
The Solar Pathfinder now has a unique solar thermal progam for the site analysis that can do an NREL solar analysis from a digital picture . Their solar hot water estimating program can be downloaded on your computer that allows you to enter data for a site specific performance analysis.from th

Re: [RE-wrenches] Fronius monitoring

2009-03-10 Thread William Miller
Mario: Thanks. We'll give it a try. William At 12:39 PM 3/10/2009, you wrote: Content-Language: en-US Content-Type: multipart/alternative; boundary="_000_EDC01F5F5941C546B43997A6FDE59B3B1E20B37EB7postmanwestwo_" William, In my case the full monitoring system was installed on a IG5000 th

Re: [RE-wrenches] Lightning protection system

2009-03-10 Thread Joel Davidson
In 1983 Arco Solar and the Lightning & Transients Research Institute, St. Paul, MN, presented a paper at the Greece PV conference titled "Ability of Photovoltaic Modules to Withstand Lightning Strikes." Summary: The ability of glass superstrate and metal/plastic substrate modules to withstand ligh

Re: [RE-wrenches] Line Side Feed In and Disconnects

2009-03-10 Thread Joel Davidson
Hello Wayne, Correct me if I am misunderstanding you. You have had to install an AC disco between the inverter and the service panel backfeed breaker. Now you have to install another AC disco between the first AC disco and the service panel. Huh? Joel Davidson - Original Message -

Re: [RE-wrenches] [s-w-h] Stimulus Plan Info

2009-03-10 Thread Matt Tritt
I would opt for "sort of new". Matt roger dixon wrote: AWEA's FAQ sheet addressing the Economic Stimulus Package states that for equipment to qualify for the 30% tax credit it must "generally" be new. Can anyone define this a bit better? Would anyone know if fully reconditioned and/or rebuil

Re: [RE-wrenches] Lightning protection system

2009-03-10 Thread Darryl Thayer
Thanks Joel the Lightning and Transients research Institute has been closed, I am sorry to say. The paper is valuable and reassuring, if the module frames are properly grounded, they act as a shield and will protect the PV source and output circuits if they are shielded via conduit or coaxial

Re: [RE-wrenches] Line Side Feed In and Disconnects

2009-03-10 Thread Darryl Thayer
I hope I can help. If he installs ahead of the meter (line side install) he is installing a new service. because of the high short current rating of the Grid, he must use a "Service Rated Disconnect" If you install a new service its disconnect must be grouped with the other disconnect. If th

Re: [RE-wrenches] Lightning protection system

2009-03-10 Thread Joel Davidson
A few years ago, Bill Brooks or another wrench specified 5 ohms or less when measured with a special meter but I can't recall the meter. No problem if the ground is saturated, but lightning in the southwest US often comes in the storm front before the soaking rain. - Original Message -

Re: [RE-wrenches] Line Side Feed In and Disconnects

2009-03-10 Thread Joel Davidson
I agree. A true line-side connection is a new service and requires a circuit breaker and disconnect and revenue meter. I guess a better description for what we've been talking about is a load-side tap that is between the existing revenue meter and the distribution service panel main circuit bre

Re: [RE-wrenches] Lightning protection system

2009-03-10 Thread Darryl Thayer
If the lightning pulse is 10,000 amps and I want to limit it to 1000 volts I need less than 1/10 ohm. I guess that 1 ohm would be ok? yes even here in minnesota often strikes come before rain. I have used two types of meter, Fall of potential and clamp type. Fall of potential meters use tw

Re: [RE-wrenches] Line Side Feed In and Disconnects

2009-03-10 Thread William Miller
Friends: I was not aware that the goal was to install the point of connection ahead of the meter. The section says: "A photovoltaic power source shall be permitted to be connected to the supply side of the service disconnecting means..."(emphasis added). The goal is to be down stream of the

Re: [RE-wrenches] Line Side Feed In and Disconnects

2009-03-10 Thread David Brearley
This is a feed-in tariff program, not a net-metered program. So as long as the inverter output circuit is metered, no one is giving away any PV generated electricity. In fact, PV-generated energy is bought at $0.32/kWh: http://www.greentechmedia.com/articles/gainesville-to-launch-solar-feed-in-t a