A reply from Theo Van regarding wire locators.
-- Forwarded message --
From: Theo Van
Date: Wed, Mar 16, 2016 at 11:27 AM
Subject: Re: Wire locator
To: Kristopher Schmid
I have a Greenlee 508 S, my second one. Transmitter sends a
Hi Wrenches,
Can anyone recommend a good structural engineer in the Bay Area?
Blessings,
Kelly
~
Kelly Larson
707-223-3209
Box 504
Ukiah, CA 95482
Electrical Engineer
NABCEP Certified Solar PV Installation Professional
IREC Certified Master Trainer for Photovoltaic Installer
CA Electrical
Hi Ray,
Yes, 690.12 is very tough to comply with for battery systems. The way we
have done it is via Midnite's system and using shunt trip breakers. We
have just shunt tripped the master Inverter breaker and this puts the other
inverter(s) into standby with most off-grid systems. I like Brad's
I have been contacted by the inverter sales rep that provided this product
to us and he has asked that I clarify the situation.
first off the HiQ inverter system used was test equipment from the
manufacturers so it may not represent their current product line.
This project is located in Redway
All the information I received to my post has been very helpful.
Products are being constantly changed, and I wanted to make sure
previous edition products are not reflective of today's products, if
today's products have solved legacy problems. I've talked to the
manufacturer and they have
5 matches
Mail list logo