Hmm, I thought I deleted the large pix file.
Dave Angelini Offgrid
Solar
"we go where powerlines don't"
http://members.sti.net/offgridsolar/
[1]
e-mail offgridso...@sti.net [2]
text 209 813 0060
On Thu, 25 Feb 2021
15:48:47 -0500, Ray wrote:
This is why I have folks send me pics
first,
Definitely have done some customer firing. My off time is extremely
valuable to me at this stage of life. If they can't follow the
instructions, it is in the contract and we part ways.
The same with
manufacturers, If they can't get me product that lasts and has built-in
quality I do not want t
And did you ever walk away from from a longstanding PITA? I call it "firing" a
customer. You took them on years ago 'cause maybe you needed the work, or just
felt sorry for them. But have been nothing but a pain for all the reasons you
mentioned. And they get upset when you finally tell them, ni
The Generac solution has worked well for me.
Michael D Nelson
MD Electric & Solar, Inc.
707-684-0064 mobile
707-884-1862 office
www.mdelectricsolar.com
www.facebook.com/mdelectricandsolar
> On Feb 25, 2021, at 5:40 AM, Nik Ponzio, Building Energy
> wrote:
>
>
> We are installing 25kW of PV
Succinctly put & thank you!
Add to that "I did it myself what do you think?"
Learning to walk away is probably one of the hardest lessons in the solar
business I have had to learn (years ago).
I just had a request to add batteries to a11 KW Solar Edge system that was
according to the phone cal
We are installing 25kW of PV on a service with an existing backup generator
(Eaton 30KW) and auto transfer switch. Because of the remote location of
the generator and transfer switch, we can not easily connect on the
grid-side of the transfer switch as we usually do (without cutting a very
long tre
6 matches
Mail list logo