. Everything is mounted
on DIN rails in the control panel.
Jon Haeme
> On Apr 27, 2024, at 7:46 AM, John Blittersdorf via RE-wrenches
> wrote:
>
> Shifting the small off grid thread a little, I'm trying to find replacement
> wind turbines for the Bergey XL.1 in the 1-2 kw
ABCEP renewal. I have only heard of one distributor planning an
Advanced PV seminar but I would like to see some manufacturers step
up with some offerings.
Jon
Jon Haeme Innovations
Kempton, IL
___
List sponsored by Home Power magazine
List Addres
rds so I went ahead and changed them
out, but the same error occurred again. We called Outback support
again but did not get a satisfactory answer on how to fix it.
Has anyone else run into this problem ? I suspect the Mate may be
flaky.
roblem ? I suspect the Mate may be flaky.
Jon
Jon Haeme Innovations
Kempton, IL
___
List sponsored by Home Power magazine
List Address: RE-wrenches@lists.re-wrenches.org
Options & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wren
My concern is that as manufacturers look to cut costs they move
production to places like China where quality suffers and job losses
in this country continue to grow.
Jon
Jon Haeme Innovations
Kempton, IL
NABCEP certified Solar PV installer # 102503-19
On Apr 1, 2009, at 7:21 AM, D
batteries in the garage instead of the XW. However if you
already have the XW in place then I would suggest using the Apollo
T80HV charge control as suggested by Daryl . It has a max of 200 VOC
at 80 amps . Why make it more complicated than it needs to be ?
Jon
Jon Haeme Innovations
Kempton, IL
how it
works.
Jon
Jon Haeme Innovations
NABCEP certified Solar PV installer
Kempton, IL
On Dec 10, 2008, at 7:34 AM, design wrote:
Fellow Wrenches,
I am looking to see if there is a way to connect the Xantrex XW
inverters to a PC for data acquisition and/or control. The cablin
would like to hear if you get it
resolved and how.
Jon
On Nov 29, 2008, at 10:55 AM, Peter Parrish wrote:
Jon
Jon Haeme Innovations
NABCEP Certified Solar PV installer # 102503-19
Kempton, IL
I haven’t been offered a board swap yet (I must wonder why at this
far point in the saga
th it. It is a big improvement
over the SW series inverters it replaced. Being able to swap out
boards without removing it from the wall and sending to a repair
center is a relief.
Though it would be nice not to have to repair anything in the first
place.
Jon
Jon Haeme Innovations
N
What are the loads on the sub-panel being backed up by this system ?
Any power being used on that sub-panel would not show up on the
screen showing power being sold to the grid . Does your charge
control show the full rated output from the array ?
Jon
Jon Haeme Innovations
NABCEP
10 matches
Mail list logo