At 9:20 AM +1000 6/12/10, Geoff Huston wrote:
On 12/06/2010, at 8:08 AM, Stephen Kent wrote:


Given these assumptions, we have adopted an initial design in which both key rollover and algorithm suite migration entail an interval during which old and new CA certificates, CRLs, and signed objects are maintained in parallel in the repository system. For key rollover, we anticipate that this interval will be relatively brief, say 3-7 days. For algorithm suite migration we anticipate that it will be much longer, as noted above in assumption #3.


For algorithm suite migration this extended period of parallel operation with an imposition of top down migration is certainly an interesting approach. The comments in section 3 of draft-ietf-sidr-rpki-algs-01.txt address this form of algorithm migration and cast some doubt as to the feasibility of such an approach within the scope of conventional operational practices when looking at the behaviour of widely distributed data structures.

Can you elaborate on this concern?

If the operational impost of maintenance of parallel structures over an extended period was considered to be too risky in terms of ensuring a requirement for precise coherence between the multiple structures and ensuring identical outcomes for every relying party , are there alternative approaches that mitigate some of these risks?

I initially investigated an approach that allows a CA at any point in the hierarchy to begin using the next alg suite, subject only to the constraint that the CA's parent is prepared to effect PoP with the new alg suite when issuing a cert to that CA. However, this approach seems to result in much greater complexity than a top-down approach.

Steve