as co-editor I support to work on this.

My current work seems to indicate that both drafts may even merge into one.
But we'll leat the WG speak up once I am done with the edits.

Bert

On 8/5/11 8:25 PM, Sandra Murphy wrote:
The working group has been requested to adopt
    draft-ymbk-bgp-origin-validation-mib
    draft-ymbk-rpki-rtr-protocol-mib

as working group drafts.

As these are drafts are so similar in topic, I am running the adoption call for 
both simultaneously.

Please respond to the list with your opinion as to whether you accept these drafts as working group drafts and are willing to work on them. Remember that you do not need to accept all content in a draft to adopt, as draft editors are required to reflect the consensus of the working group.

This call will end 19 Aug 2011

Those who anticipated this call for adoption and have already responded do not 
need to respond again.

--Sandy, speaking as wg co-chair



_______________________________________________
sidr mailing list
sidr@ietf.org
https://www.ietf.org/mailman/listinfo/sidr


_______________________________________________
sidr mailing list
sidr@ietf.org
https://www.ietf.org/mailman/listinfo/sidr

Reply via email to