Hello everybody,

one of our user want to run a job with many nodes, which need different 
resources.
1 - 2: je 2 CPUs, 30 GB RAM
3 - 4: je 24 CPUs, 64GB RAM
5 -10: je 8 CPUs, 40GB RAM
It is possible to start such a job without wasting resources, because the most 
of our nodes have 24 CPUs and 64GB RAM.
It is also possible to start different jobs, for every resource group one for 
example, but they have to start at the same time.
Could anybody solve this request?

Kind regards,
Danny Rotscher

Attachment: smime.p7s
Description: S/MIME cryptographic signature

Reply via email to