Poor Roads Could Hinder Access To Kapoeta

Kapoeta residents are complaining about bad road conditions which they
say are limiting their access Torit Town affecting development in the
area.


 22 April 2013





A section of the Ikwoto road in Eastern Equatoria State in March 2013.
[Gurtong | File]

By Peter Lokale Nakimangole

TORIT, 22 April 2013 [Gurtong] – While calling for quick attention
from the government, the Sudan Peoples’ Liberation Movement Deputy
Secretary-General Dr. Ann Itto Leonardo witnessed and confirmed the
state of Kapoeta-Torit road condition as appalling during her recent
visit to the region.

Briefing journalist at Hotel Torit in Torit shortly after her arrival
from Kapoeta, Dr. Itto expressed profound worry over Kapoeta-Torit
road conditions saying very soon as rains are commencing, Kapoeta will
be disconnected or left in an isolation from Torit.

The State Transport and Roads Minister Charles Lokonoi Ambrose said
Eastern Equatoria roads were in deplorable state including the
Torit-Juba, Torit-Kapoeta, Hiyala-Tseretenya, Kapoeta Nadapal as rain
season starts.

The minister cited the Kudo Bridge between Torit and Lirya, Loyakali
at between Buno and Korjip along Kapoeta-Narus highway and the four
critical bridges between Kapoeta and Loriyok towns which have become
difficult to use as they have multiple potholes in them.

The Minister appeals for swift attention and action from the national
government to intervene as all the highways he has mentioned are in
dangerous condition saying if there is no appropriate concentration
from relevant authorities, the Torit, being the State capital of
Eastern Equatoria, will soon be detached from the counties and Juba.

Blaming the national authorities for highway delays in the
construction of Nisitu-Nadapal, the minister complained that the road
remains the only path for Juba to get connected to Kenya through
Nadapal of South Sudan and Lokichoggio of Kenya which would boost
bilateral ties through trade hence economic growth.

In January, the minister said that the National Ministry of Roads and
Bridges in close consultation with the World Bank, is currently still
looking for trusted single contractor to re-contract other
subcontractors to do the highway which will begin at Nadapal until it
ends at Nisitu in Juba.

The Minister explained that the sub-contractors shall divide the
highway into 50 kilometres each but shall be supervised by the senior
globally contracted company.

He believes once the highway will enhance trade and industry between
the two countries.

Out of US$ 360 Million, the Minister revealed US$ 75 Million has been
released to enable the phase one construction.

Nadapal, the main border linking South Sudan to Kenya is where the
construction of road will commence to end at Nisitu, where Torit road
intersects Nimule-Juba highway.

Last year, Kenya and South Sudan were in talks to construct a US$ 1
billion road linking Eldoret to Juba to enhance trade between the two
countries.

The 920 kilometre Eldoret-Juba road is critical to enhancing trade
between the two countries.

The road will have a one-stop border post at Nadapal, axle load
facilities and social amenities like boreholes and security outposts.

South Sudan minister for Roads and Bridges, Mr Gier Aluong, said the
country’s citizens have put the government under pressure to upgrade
the road network, which has immense social, economic and geopolitical
importance.


 Posted in: Home, Travel

-- 
You received this message because you are subscribed to the Google Groups 
"South Sudan Info - The Kob" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
To post to this group, send email to [email protected].
For more options, visit https://groups.google.com/groups/opt_out.


Reply via email to