Jesus M. Rodriguez wrote:
Hey Spacewalk hackers,

I'd like to wrap up feature and bug fixing by 12/5 so that we can
start the package building process on Monday 12/8 for a release on
12/15. Let me know if this will be a problem.

Feature freeze: 12/5
Packages: 12/9
QA freeze: 12/12
Release: 12/15


I'm thinking since the scope of features in 0.4 is much much larger than the previous releases we are going to need to spend more time in testing (multiorg and cobbler-koan come to mind)

I'd advocate we instead release a QA build to the public on 12/15 and do the final release on say ... 12/22? Or after the break? I realize I'm calling for us to be late but it seems rational to me.

Anyone else agree/disagree?

--
Mike McCune
mmccune AT redhat.com
Engineering               | Portland, OR
RHN Satellite             | 650.567.9039x79248

_______________________________________________
Spacewalk-devel mailing list
Spacewalk-devel@redhat.com
https://www.redhat.com/mailman/listinfo/spacewalk-devel

Reply via email to