Situation.....Flow test shows water flow at 600 gpm at 29 psi
Hose requirement is 500 gpm at the main hydrant
System requires 600 gpm for 90 minutes
Using a tank, can I say under a flowing situation, the tank will fill at a rate 
of 100 gpm because of the hose requirement?
Would I then require a tank based on 500 gpm for 90 minutes or a tank of 45,000 
gallons?
Thanks for your help

Geoffrey H. Dyce