Bill,

 

An excellent idea, please count me in. There are many things could be
better defined. We currently involved in a number of 13R projects at DOD
facilities. Most have common areas like dayrooms, laundry rooms
mechanical rooms and so on but the entire building is classified as R2
occupancy, not mixed use.

 

The UFGS is another thing all together. There is some down right goofy
stuff in there. Like access panels to inspect and adjust grooved
couplings above a sheet rock ceiling.

 

Ron Fletcher

Aero Automatic Sprinkler

21605 N. Central Ave

Phoenix, AZ 85024

P: 623.580.7836

F: 623.434.3420

C: 602.763.4160

-----Original Message-----
From: [email protected]
[mailto:[email protected]] On Behalf Of
[email protected]
Sent: Friday, June 05, 2009 8:34 AM
To: [email protected]
Subject: DoD UFC - 13R System Design

 

I know there are quite a few individuals out there who work with the UFC

3-600-01.

 

Perhaps we can start a discussion about the application of the DoD 13R

criteria.  After working a number of jobs using NFPA 13R I find the

application of this document is not clearly defined in UFC 3-600-01.  We

have already discussed the use of 13R in a mixed use building (can't do

it per the IBC but maybe not so clear per UFC 3-600-01).

 

My suggested DoD 13R approach:

 

1.  Inside the dwelling unit use the calculation criteria from NFPA 13R

(not UFC Table 4-1), supplemented by UFGS 21 21 00, 1.3.2.

2.  Sprinkler calculation outside the dwelling unit would be per NFPA 13

and not Table 4-1 in the UFC (3000 sq ft with ceiling height reduction,

etc).

3.  Room design rule can be applied (vs full 3000 sq ft with ceiling

height reduction) outside the dwelling unit.

4.  No hose stream (vs a hint that some hose stream should be applied by

the fill-in-the-blank spot in UFGS 21 21 00, ).

 

For four story buildings a standpipe system is required, but the water

supply will most likely be supplied by the local fire department.

 

I've requested clarification on this topic without success, but I wanted

to put a set of guidelines out there for discussion.

 

Questions:

 

1.  How are the list members now applying 13R for DoD work?

2.  Have any of you ever received specific guidance from DoD reps on

this topic?

 

Bill Brooks

 

William N. Brooks, P.E.

Brooks Fire Protection Engineering Inc.

372 Wilett Drive

Severna Park, MD 21146

410-544-3620 Phone

410-544-3032 FAX

412-400-6528 Cell

 

_______________________________________________

Sprinklerforum mailing list

http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum

For Technical Assistance, send an email to:
[email protected]

 

To Unsubscribe, send an email
to:[email protected]

(Put the word unsubscribe in the subject field)

 

_______________________________________________
Sprinklerforum mailing list
http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum
For Technical Assistance, send an email to: [email protected]

To Unsubscribe, send an email to:[email protected]
(Put the word unsubscribe in the subject field)

Reply via email to