Has anyone ever come across these Armstrong Optima Capz Panels? For product
information you can Google "optima capz". Basically they are an acoustical
panel that are mounted within 6" of the roof deck in an "open" type ceiling
installation. My question is since it is open to deck all around these
panels wouldn't you need heads both above and below the panels? With there
only being 6" max space above these panels and taking into account the top
chord of the joist it only leaves you with 3" or so to run the pipe, add
upright heads, and arm-over's to catch the pendants.......  Is there some
code section that addresses situations like this?
 

Regards,

                                 <http://www.firstdefensefire.com/>  

 

 




E-mail message checked by Spyware Doctor (6.0.1.441)
Database version: 6.13020
http://www.pctools.com/en/spyware-doctor-antivirus/
_______________________________________________
Sprinklerforum mailing list
http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum
For Technical Assistance, send an email to: [email protected]

To Unsubscribe, send an email to:[email protected]
(Put the word unsubscribe in the subject field)

Reply via email to