I ma working on a job where the engineer wants to run the mains 
through penetrations in steel beams. The question came up about 
clearance between the penetration and the pipe. Section 9.3.4 does 
not specifically address beams, but it is referenced in the handbook 
commentary under 9.3.4.1. Any thoughts on what minimum penetration 
size is required?