Anyone ever got an even semi-rational reason for differences in methods for
various sizes within the same class of item?  For example it's common to see
2" and smaller pipe required to be threaded and 2.5" and larger allowed to
be grooved.  Why a break at 2"?  Not talking a schedule difference but yes
sometimes it's a 2" sched 40 and larger sched 10.  Can't thread sched 10 but
1.5" and 2" are easily grooved.  If 4" is OK to be sched 10 why not 1.5"?
But I see it often enough when there is no sched specified.   For example
they will accept XL pipe theaded but not Dyna Flow grooved.  

 

Another common one is OS&Y for 4" and larger but smaller can be butterfly?

 

Not in a fight or anything.  Just reading a 45 page spec for a simple heated
indoor bus parking structure.  And as usual just plain ol' confused to what
they want, because I bet they have no idea what they really want and
certainly don't know why.

 

Chris Cahill, P.E.

Fire Protection Engineer

Sentry Fire Protection, Inc.

 

763-658-4483

763-658-4921 fax

 

Email: [email protected]

 

Mail: P.O. Box 69

        Waverly, MN 55390

 

Location: 4439 Hwy 12 SW

              Waverly, MN 55390

 

_______________________________________________
Sprinklerforum mailing list
[email protected]
http://fireball.firesprinkler.org/mailman/listinfo/sprinklerforum

For Technical Assistance, send an email to: [email protected]

To Unsubscribe, send an email to:[email protected]
(Put the word unsubscribe in the subject field)

Reply via email to