Trying to calc a recycling sorting facility buildout - there is a small 
"hut" in the center where the sorting takes place and holes in the floor 
(approx 3-6 x 2-6) with bins underneath for the sorted materials. 
Therefore there is protection at the roof of the building, at the roof 
of the "hut" and under the floor of the hut.

Technically speaking, we can calc one level of protection, but my 
question is for those who may have experience with these, should we calc 
the lower level and include some heads inside the hut on the chance that 
the fire could come through the holes in the floor to the interior of 
the hut?

Thanks
-- 
Greg McGahan
_______________________________________________
Sprinklerforum mailing list
[email protected]
http://fireball.firesprinkler.org/mailman/listinfo/sprinklerforum

For Technical Assistance, send an email to: [email protected]

To Unsubscribe, send an email to:[email protected]
(Put the word unsubscribe in the subject field)

Reply via email to