I swear this was written down somewhere but I can't seem to find it at the 
moment.  I'm looking for NFPA 13/25/72 and/or IFC guidelines that address how 
long one has to address a deficiency based on it's severity.  We work with a 
single client, but their operations are split up into dozens of "areas" that 
are in effect other clients.  We have some resistance when it comes to 
scheduling and we're trying to build clearer and backed by code (or at least an 
authoritative source) guidelines for how long maintenance work can wait.  Some 
of the maintenance in question is piddly little stuff, but some of it is pretty 
serious and we'd like to better qualify how we respond.  I'm not real concerned 
about edition of the code, I have access to the last 15 years or so but recent 
editions are preferable.
 
Thanks in advance, 
Mike Morey, SET, CFPS
Sprinkler Designer
BMW Constructors, Inc.
O: 317.651.0596 | C: 317.586.8111
www.bmwc.com <http://www.bmwc.com/> 
 