Got a project that HDPE AWWA C906 pipe and fittings were installed.
The stub-up through the floor is a piece of HDPE AWWA C906 pipe with
a cap fused on the end and not rodded.
I've never seen this done before, is it acceptable with NFPA #24?
Mike Hairfield
_______________________________________________
Sprinklerforum mailing list
[email protected]
http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org
