Too much tunnel vision right now:
Which obstruction criteria would one use for ductwork 16" below the roof deck with 6" clear space between the duct and the roof and the sprinkler deflector at 4" below deck in a light hazard office? _______________________________________________ Sprinklerforum mailing list [email protected] http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org
