NFPA 20 (2013) Figure A.11.4.4 appears to indicate a 10 ft vertical distance 
requirement between the vent and the fill cap on a fire pump fuel tank however, 
this becomes prohibitive in providing support for vertical 4" pipe stacks off 
elevated platforms.  Does this distance have to be vertical, or may it be 
radial distance similar to what is commonly defined in NFPA 497 (2012) and API 
RP 500; more specifically as an inverse to NFPA 497 Figure 5.10.6 or API RP 500 
Figure 18?

Ryan L. Hinson, PE*, SET
Senior Fire Protection Engineer, Fire Protection Engineering Group
Burns & McDonnell
Direct: 952-656-3662
Mobile: 320-250-5404
Fax: 952-229-2923
www.burnsmcd.com<BLOCKED::www.burnsmcd.com>
*Registered in MN


Proud to be #14 on FORTUNE's 2014 List of 100 Best Companies to Work For

_______________________________________________
Sprinklerforum mailing list
[email protected]
http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org

Reply via email to