We have a row of single row racking and we are protecting with two levels of
in-rack sprinklers, the levels of the beams are not standard, there is a
difference of 12" between some of the levels.

 

My question is if we are installing heads every transverse flue space (4' to
5' apart) what do you do when there is a step down or step up in the beam
levels?

 

 

Thank you

 

 