Can I run pipe into the elevator shaft, supply the head in the pit and then use the same pipe to supply and terminate in the elevator machine room? I have done the opposite order and supplied the machine room first then the head in the pit but that was only one penetration through the elevator shaft. This job I am on is out of sequence for the build so I can’t supply it the normal way but they still want the elevator in service.
Thanks, Dewayne