Heat/smoke detectors and we use 200F standard response sprinklers. The detectors shut down the elevator before the sprinkler head goes off. I have sent in this request to the elevator inspector also but they are not very quick to respond.
*From:* Sprinklerforum [mailto: [email protected]] *On Behalf Of *Forest Wilson *Sent:* Friday, July 22, 2016 7:59 AM *To:* [email protected] *Subject:* Re: Elevator piping In addition to this forum, I would also consult the Elevator Code. Maybe call your state elevator code inspector. How will you do the stunt trip if you arrange the piping this way? On Jul 22, 2016 7:47 AM, "Dewayne Martinez" <[email protected]> wrote: Can I run pipe into the elevator shaft, supply the head in the pit and then use the same pipe to supply and terminate in the elevator machine room? I have done the opposite order and supplied the machine room first then the head in the pit but that was only one penetration through the elevator shaft. This job I am on is out of sequence for the build so I can’t supply it the normal way but they still want the elevator in service. Thanks, Dewayne _______________________________________________ Sprinklerforum mailing list [email protected] http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org
_______________________________________________ Sprinklerforum mailing list [email protected] http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org