NFPA 13 (07ed)


I have an existing 5th floor shell space that is installed as a light
hazard dry system that has pipe in the shell space and in the attic.  They
are turning this floor into a dormitory (R-2).

1)Can I use listed residential heads on return bends and only pick up 4
heads per 11.3.1.1 or will I need to pick up 1950SF?  What if there are
incidental areas such as a laundry room, ect. in the same areas as the dorm
rooms?

2)What would be the required trip time be per Table 7.2.3.6.1?  15sec for
residential or 60sec for light hazard?



Thanks,

Dewayne Martinez

Fire Protection Design Manager



*TOTAL** Mechanical*

*Building** Integrity*
W234 N2830 Paul Rd.
Pewaukee, WI  53072

[email protected]

Ph:  262-522-7110

Cell: 414-406-5208

*http://www.total-mechanical.com/ <http://www.total-mechanical.com/>*



[image: cid:[email protected]] [image:
cid:[email protected]] [image:
cid:[email protected]] [image: Top Workplaces 2015]



*TOTAL Mechanical voted “Top Workplace” for a 4th consecutive year. *
_______________________________________________
Sprinklerforum mailing list
[email protected]
http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org

Reply via email to