Often I do a multi-story building with typical floors. So I only provide a
calculation on the top floor and first floor due to a higher hazard area. At
the end of the job we are asked to provide calc. plates for every floor. I
will just copy the typical floor information down, but I know the pressures
will be incorrect as I move down the building. 

 

Is there a requirement for this?

 

Jerry Van Kolken

Millennium Fire Protection Corp.

2950 San Luis Rey Rd.

Oceanside, CA 92058

(760) 722-2722 FX 722-2730

 

_______________________________________________
Sprinklerforum mailing list
[email protected]
http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org

Reply via email to