What is supporting the T&G?
    
  
 Todd G Williams, PE  
Fire Protection Design/Consulting
  
Stonington, CT
  
860-535-2080 (tel:860-535-2080)  (ofc)
  
860-553-3553 (tel:860-553-3553)  (fax)
  
860-608-4559 (tel:860-608-4559)  (cell)
  
  
  
  
  

  
  
>   
> On Jun 14, 2017 at 11:14 AM,  <Brian Harris 
> (mailto:[email protected])>  wrote:
>   
>   
>         
>   
>
> Looking for opinions on a project we’re bidding. It’s an old rectangle shape 
> school building that has concrete joist crossing the building with tongue  &  
> grove wood decking. Most of the rooms have a sloped ACT ceiling that’s 
> approximately 6”-8” down from the deck. Any thoughts on protecting the deck? 
> (see link for pic’s)
>
>   
>
>   
>
>   
>
>  https://www.dropbox.com/sh/7mwoppgmu5aq27e/AADOdqgkge40MHXeUsex9RHSa?dl=0
>
>   
>
>   
>
>   
>
>  Brian Harris, CET
>
>   
>
>  BVS Systems Inc.
>
>   
>
>  Design Manager
>
>   
>
>   bvssystemsinc.com (http://bvssystemsinc.com/)
>
>   
>
>  Phone: 704.896.9989
>
>   
>
>  Fax: 704.896.1935
>
>   
>
>   
>
>   
>  _______________________________________________ Sprinklerforum mailing list 
> [email protected] 
> http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org
>   
  
  
 
_______________________________________________
Sprinklerforum mailing list
[email protected]
http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org

Reply via email to