Working on a wood building per NFPA-13. Contract drawings show drywall above ceiling running to deck, GC stopped drywall 8" above ceiling leaving exposed wood & insulation. Any way this area won't need sprinklers? See link for pictures.
https://www.dropbox.com/sh/7mwoppgmu5aq27e/AADOdqgkge40MHXeUsex9RHSa?dl=0 Brian Harris, CET BVS Systems Inc. Design Manager bvssystemsinc.com<http://bvssystemsinc.com/> Phone: 704.896.9989 Fax: 704.896.1935
_______________________________________________ Sprinklerforum mailing list Sprinklerforum@lists.firesprinkler.org http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org