I have a project with Group A plastic storage, We are installing ESFR sprinkler to protect the storage per Table 17.2.3.1 (2013). I just found out a bunch of radiant heats are going to be installed in the area, and I might need to up the temp of the ESFR. Is there a temp. requirement for the ESFR similar to the curves in chapter 16-2.1.3.2? I've gone through chapter 17 and can't find it, so I wanted to confirm I didn't miss it.
Thanks Jerry Van Kolken Millennium Fire Protection Corp. 2950 San Luis Rey Rd. Oceanside, CA 92058 (760) 722-2722 FX 722-2730
_______________________________________________ Sprinklerforum mailing list [email protected] http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org
