Vince,
If the mezzanine steel is deep enough and solid it can be the draft curtain.



*Glen Bue**low*

*Glen W. Buelow, Inc.*
*Fire Protection Design and ConsultingCleveland 330.220.7201 <330.220.7201>
*●* Akron 330.665.4439 <330.665.4439>*

On Thu, Jan 25, 2018 at 8:50 AM, Vince Sabolik <[email protected]> wrote:

> Good morning, forum -
>
> Looking for opinion or code reference.
>
> Is a draft curtain required?
>
> ESFR system at roof 25 ft
>
> Mezzanine at 12 ft, opens out to high roof
>
> Can standard qr heads be used under the mezzanine without a draft curtain?
>
> thanks, Vince
>
>
> 11351 Pearl Road /  Suite 101
> Strongsville, Ohio 44136
> Phone 440 238-4800 <(440)%20238-4800> Fax 440 238-4876 <(440)%20238-4876> Cell
> 440 724-7601 <(440)%20724-7601>
>
>
> * Vince Sabolik *
>
> _______________________________________________
> Sprinklerforum mailing list
> [email protected]
> http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.
> org
>
>
_______________________________________________
Sprinklerforum mailing list
[email protected]
http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org