Floor Zone Control Assemblies in Multistory buildings exceeding 2 stories in height are required in accordance with NFPA 13.
Is this also required in residential buildings designed in accordance with NFPA 13R? The building in question is 3 stories and of wood frame construction. Regards, G. Tim Stone G. Tim Stone Consulting, LLC NICET Level III Engineering Technician Fire Protection Sprinkler Design and Consulting Services 117 Old Stage Rd. - Essex Jct., VT. 05452 CELL: (802) 373-0638 <mailto:tston...@comcast.net> tston...@comcast.net
_________________________________________________________ SprinklerForum mailing list: https://lists.firesprinkler.org/list/sprinklerforum.lists.firesprinkler.org To unsubscribe send an email to sprinklerforum-le...@lists.firesprinkler.org