Floor Zone Control Assemblies in Multistory buildings exceeding 2 stories in
height are required in accordance with NFPA 13.

 

Is this also required in residential buildings designed in accordance with
NFPA 13R? The building in question is 3 stories and of wood frame
construction.

 

Regards,

G. Tim Stone

 

G. Tim Stone Consulting, LLC

NICET Level III Engineering Technician

Fire Protection Sprinkler Design

and Consulting Services

 

   117 Old Stage Rd. - Essex Jct., VT. 05452

                 CELL: (802) 373-0638  

              <mailto:tston...@comcast.net> tston...@comcast.net

 

_________________________________________________________
SprinklerForum mailing list:
https://lists.firesprinkler.org/list/sprinklerforum.lists.firesprinkler.org
To unsubscribe send an email to sprinklerforum-le...@lists.firesprinkler.org

Reply via email to