Not required-at least in 2016 edition. Local code adoptions may exceed that.


Taylor Schumacher
Security Fire Sprinkler<http://www.j-berd.com/>
1 Industrial Blvd | Sauk Rapids, MN 56379
Office: 320.656.0847 | Direct: 320.640.7050

From: tston...@comcast.net <tston...@comcast.net>
Sent: Thursday, November 09, 2023 7:53 AM
To: sprinklerforum@lists.firesprinkler.org
Subject: [Sprinklerforum] Floor Zone Control Assemblies


Caution: This email originated from outside your organization. Please take care 
when clicking links or opening attachments.


Floor Zone Control Assemblies in Multistory buildings exceeding 2 stories in 
height are required in accordance with NFPA 13.

Is this also required in residential buildings designed in accordance with NFPA 
13R? The building in question is 3 stories and of wood frame construction.

Regards,
G. Tim Stone

G. Tim Stone Consulting, LLC
NICET Level III Engineering Technician
Fire Protection Sprinkler Design
and Consulting Services

   117 Old Stage Rd. - Essex Jct., VT. 05452
                 CELL: (802) 373-0638
             tston...@comcast.net<mailto:tston...@comcast.net>

_________________________________________________________
SprinklerForum mailing list:
https://lists.firesprinkler.org/list/sprinklerforum.lists.firesprinkler.org
To unsubscribe send an email to sprinklerforum-le...@lists.firesprinkler.org

Reply via email to