I have seen something like this type of arrangement a few times with exception 
of using a square steel washer plate on the top and bottom and locking it into 
place with a nut and lock washer on top and bottom.

Regards,

Sean W. Conlin, A.Sc.T.
Director

[cid:[email protected]]

37 Summerfield Crescent
Brampton, ON L6X 4K4
T: 905-216-0922
C: 416-317-0028
E:[email protected]

This message, including any attachments is considered confidential and for use 
only by the intended recipient(s).
Any other distribution, copying or disclosure is strictly prohibited. Please 
delete this communication and notify
Demand Sprinkler Design Inc. if you are not the intended recipient or have 
received this message in error. Demand
Sprinkler Design Inc. accepts no responsibility or liability for any loss or 
damage from use, including damage from viruses.

From: Brian Harris <[email protected]>
Sent: October 22, 2024 4:44 PM
To: [email protected]
Subject: [Sprinklerforum] Nut & Bolt / Bottom Joist

Anybody ever use this set-up? We have a situation where hanging from the top 
chord is not an option.

[cid:[email protected]]

Thank you,

Brian Harris, CET
BVS Systems Inc.
bvssystemsinc.com<http://bvssystemsinc.com/>
Phone: 704.896.9989
Fax: 704.896.1935

_________________________________________________________
SprinklerForum mailing list:
https://lists.firesprinkler.org/list/sprinklerforum.lists.firesprinkler.org
To unsubscribe send an email to [email protected]

Reply via email to