Intended use of highway=construction is when a new road is constructed on a
place where no road was before.
Tagging like this, without changing the existing tags
highway=primary
ref=R32
construction=minor
constriction:start=2012-08-01
construction:end=2012-09-30
has the advantage that construction tags can be removed by a script,
checking the end date.
But, as Ben said, do not map road works, because mosttimes people forget
to change at the end of the works.
Regards,
Gerard.
Ben Laenen wrote:
General consensus is to not tag roads for roadworks (like other temporary
structures). Except in the cases where they will take a lot of time and where
someone will follow up closely so everything will be updated soon enough in
OSM.
Everything else should stay in a database outside of OSM, just like one would
do traffic information.
So, for example a road closed for 2 months: not enough for tagging it
highway=construction.
Greetings
Ben
On Wednesday 20 June 2012 10:07:06 Nicolas Pettiaux wrote:
hello the list,
Wouldnt it be interesting to integrate the werken / chantiers in OSM
See
http://www.bruxellesmobilite.irisnet.be/news/les-grands-chantiers-de-lete/
I bet it would help make OSM the most online routing map for Brussels.
Ideas, opinions, faisability ?
The data are online, mostly in an awkrard pdf !
Regards,
Nicolas
_______________________________________________
Talk-be mailing list
Talk-be@openstreetmap.org
http://lists.openstreetmap.org/listinfo/talk-be
_______________________________________________
Talk-be mailing list
Talk-be@openstreetmap.org
http://lists.openstreetmap.org/listinfo/talk-be