Greetings,

The scheduler will do this queuing - but the scripts all need to be within
the same project to do so. 

 

There is a way to have scripts communicate with each other. And the example
listed below describes how to use this ability to have one project schedule
scripts in other projects.

http://www.bostonworkstation.com/customer_center/script_center/script_detail
s.aspx?id=150&cat=3

 

The requests for a scheduler that is both external and smart have not gone
unnoticed!

 

Regards,

Thom

 

 

Thom C. Blackwell

Product Manager

Boston Software Systems

(866) 653-5105 ex 807

www.bossoft.com <http://www.bossoft.com/> 

Sign <http://www.bostonworkstation.com/customer_center/special_events.aspx>
up for my weekly webinar!

 

LEGAL NOTICE Unless expressly stated otherwise, this message is confidential
and may be privileged. It is intended for the addressee(s) only. Access to
this E-mail by anyone else is unauthorized. If you are not an addressee, any
disclosure or copying of the contents of this E-mail or any action taken (or
not taken) in reliance on it is unauthorized and may be unlawful. If you are
not an addressee, please inform the sender immediately, then delete this
message and empty from your trash.

 

From: [EMAIL PROTECTED]
[mailto:[EMAIL PROTECTED] On Behalf Of [EMAIL PROTECTED]
Sent: Friday, April 04, 2008 3:24 PM
To: [email protected]
Subject: RE: [Talk] Task Schedulers for Boston Scripts

 

But that would run the next Project, no matter what time it was scheduled?
Some of the jobs I am running, will only run once a day, while others are
every 30 min, and still others are every 45 min..Makes for a weird mix...I
also have to factor in how long the Project takes to run, (i.e. execution
time).  That is where my dilemma begins.  As jobs are "spawned" to run,
their run times are all different, so they always seem to stack on each
other, after a certain duration of time.   I would like to have a "wish
list" to have a scheduler added to Boston Workstation, that would queue jobs
to run, but would only run them one at a time, in a FIFO setup.    That
would be a utility that quite a few users, from the sounds of it, would use.


 

Ron

 

From: Bennett, Brian [mailto:[EMAIL PROTECTED] 
Sent: Friday, April 04, 2008 1:50 PM
To: '[email protected]'
Subject: RE: [Talk] Task Schedulers for Boston Scripts

 

Have you tried, or thought about using the RunProject command at the end of
each project?  You would then only need MS scheduler to use killtask to
shutdown BWS (the last project) and then launch the first project of the
day.

 

Brian Bennett 
Affinity Health Systems 
Systems Analyst 
PBS\Clinic Billing 
(920)628-9055 
[EMAIL PROTECTED] 

 

 

  _____  

From: [EMAIL PROTECTED]
[mailto:[EMAIL PROTECTED] On Behalf Of Brian Stevenson
Sent: Friday, April 04, 2008 12:58 PM
To: [email protected]
Subject: RE: [Talk] Task Schedulers for Boston Scripts

I can't really help you set it up but have been told a few times that the
several different scripts I am working on can basically be setup in the
Scheduler to run consecutively and will not over step each other as I only
have one license...  sorry if I mislead you...

 

Brian Stevenson | Systems Administrator

 <http://www.universityhealthsystem.com/> University Health System |
Business Information Services

355-2 Spencer Lane | San Antonio, TX 78229

Office | (210) 358 - 9282

Pager | (210) 756 - 0582

 

 


  _____  


From: [EMAIL PROTECTED]
[mailto:[EMAIL PROTECTED] On Behalf Of [EMAIL PROTECTED]
Sent: Friday, April 04, 2008 12:53 PM
To: [email protected]
Subject: RE: [Talk] Task Schedulers for Boston Scripts

Brian~

    What I was told, and I may be wrong, but the job you want to run, has to
be up, and minimized, before Boston's scheduler can do anything with it.  Is
that correct information?  I need the scheduler to load the job and run it,
then close it when finished.  If this can be done within Boston, can you
show me how to set it up?

 

Ron

 

From: Brian Stevenson [mailto:[EMAIL PROTECTED] 
Sent: Friday, April 04, 2008 12:44 PM
To: [email protected]
Subject: RE: [Talk] Task Schedulers for Boston Scripts

 

to my knowledge the scheduler does this...

 

Brian Stevenson | Systems Administrator

 <http://www.universityhealthsystem.com/> University Health System |
Business Information Services

355-2 Spencer Lane | San Antonio, TX 78229

Office | (210) 358 - 9282

Pager | (210) 756 - 0582

 

 


  _____  


From: [EMAIL PROTECTED]
[mailto:[EMAIL PROTECTED] On Behalf Of [EMAIL PROTECTED]
Sent: Friday, April 04, 2008 12:42 PM
To: [email protected]
Subject: [Talk] Task Schedulers for Boston Scripts

What is the best task scheduler to use for Boston Workstation scripts?  I
have 5 scripts that run multiple times during the day {disaster recovery,
file downloads, hard copy prints, etc}, and they all seem to run at
different durations and times, so the possibility of one running on top of
another exists.  I have used the task scheduler within Windows 2003 server,
and it is pretty limited.  I am looking for an alternative that will allow
jobs to specifically run at the desired times, and if another job comes up
to run at the same time, the scheduler will queue the new job to run after
the current is finished.  My current setup (the windows task scheduler),
doesn't care if another job comes up.  It runs them both simultaneous.
Then, both jobs seem to lose focus and stall out, or they get a run-time
errors.  I looked at the scheduler within the Boston software, but it didn't
suit my requirements.   Any suggestions??? 

 

Thanks, 

 

Ron Barrett, MICT

Programmer/Analyst

Coffeyville Regional Medical Center 

(620) 252-1603 

 

This email and any files transmitted with it are the property of Coffeyville
Regional Medical Center, Inc. and are confidential, intended solely for the
use of the individual that or entity to whom this email is addressed. If you
are not one of the named recipients or otherwise have reason to believe that
you have received this message in error, please notify the sender and delete
this message immediately from your computer. Any other use, retention,
dissemination, forwarding, printing, or copying of this email is strictly
prohibited.

 

  

 

Reply via email to