HI all,

What should be done with a level_crossing, when trains may cross no longer?

The junction was a level_crossing, but has been repaved and
re-sculpted.  The rails are now covered by 0.3 - 0.4 m of asphalt
which appears to have been laid directly over the tracks.  So the
railway hardware appears to still be there, but unusable.  The rails
continue both directions from the level_crossing.

To this point, I have left the level_crossing tag in place; it can
still serve as a waypoint, I suppose.

Any thoughts or widely accepted customs regarding this?

_______________________________________________
talk mailing list
[email protected]
http://lists.openstreetmap.org/listinfo/talk

Reply via email to