And

data dimensions station left right up down

 h1   2.00   0.00   8.00   0.00
...

Martin


> 14. 7. 2020 v 20:51, Tarquin Wilton-Jones via Therion <therion@speleo.sk>:
> 
> Hi Anton,
> 
>> the following line just goes down where it should be going up:
>> 
>>    data diving from to tape compass fromdepth todepth left right up down
> 
> Just realised what your confusion is. "left" "right" "up" and "down"
> have nothing to do with the station-to-station data. They are for
> passage dimensions; the distance from the station to the walls, ceiling
> and floor. You almost certainly didn't need to use those at all.
> 
> You probably wanted this:
> 
> data cylpolar from to tape compass depthchange
> r112    h1   7.00    10.00   8.00
> 
> Note the spelling. There is a typo in the Survex docs.
> 
> Tarquin
> _______________________________________________
> Therion mailing list
> Therion@speleo.sk
> https://mailman.speleo.sk/listinfo/therion

_______________________________________________
Therion mailing list
Therion@speleo.sk
https://mailman.speleo.sk/listinfo/therion

Reply via email to