#3117: When entities are performing a job and they are given a new job they do
not
go back to complete the incomplete job.
----------------------------------+--------------------
Reporter: monil.gupta@… | Type: bug
Status: new | Priority: normal
Milestone: unspecified | Component: other
Version: 3.1_beta1 | Keywords:
Blocked By: | Blocking:
Operating System: Windows 7 |
----------------------------------+--------------------
The entities should return back to the old job and should complete the old
job , when they are halted to do some task.
Test steps:
1. Start warzone2100.
2. Select the single player option.
3. Select the new campaign option.
4. Select a structure that can be assembled at a valid location from
Build(F3).
5. Durind the construction of the structure order the unit to build
another structure by selecting it from Build(f3).
6. Wait for the new construction to complete.
7. The entity should go back to the old construction for completion.
Actual result: The entities do not go back to the task and complete them.
--
Ticket URL: <http://developer.wz2100.net/ticket/3117>
Warzone 2100 Trac <http://developer.wz2100.net/>
The Warzone 2100 Project
_______________________________________________
Warzone-dev mailing list
[email protected]
https://mail.gna.org/listinfo/warzone-dev