#3118: Demolish structure icon appears for strucutres which are to yet to be
build.
----------------------------------+--------------------
Reporter: monil.gupta@… | Type: bug
Status: new | Priority: normal
Milestone: unspecified | Component: other
Version: 3.1_beta1 | Keywords:
Blocked By: | Blocking:
Operating System: Windows 7 |
----------------------------------+--------------------
Demolish structure icon should not appear on the strutures which are being
assebled , and a different entity is forced to demolish that strucuture.
Currently, when a single entity has multiple structures to be build, and a
different entity is selected and is asked to demolish a structure which is
yet to be build i.e the structures showing green projection, it actually
starts building that structure whereas the icon selected displayes
demolish structure icon.
Test Steps:
1.Run Warzone2100.
2. Select the single player option.
3. Select the new campaign option.
4. Select the engineering entity and assemble many structures from the
build menu(f3).
5. Select another entity and demolish the structure which is not
constructed and is in queue. i.e (The building which is under
construction showing the green color projextion.)
6. Check that the entity starts assembling the structure where asit was
asked for demolition.
Result: The icon of demolish shows on the in-build structure.
--
Ticket URL: <http://developer.wz2100.net/ticket/3118>
Warzone 2100 Trac <http://developer.wz2100.net/>
The Warzone 2100 Project
_______________________________________________
Warzone-dev mailing list
[email protected]
https://mail.gna.org/listinfo/warzone-dev