I could still have been talking about going forward.

--- In [email protected], "Stephanie Smilay"
<[EMAIL PROTECTED]> wrote:
>
> On 1/7/07, Ellen <[EMAIL PROTECTED]> wrote:
> > I didn't specify future or existing tracks/stations.  (Thanks Ray.)
> 
> 
> No, no, no backpedaling.  This is what you said in response to MY
> remark that it was not feasible to rip up all those tracks:
> 
> it's not the tracks, it's the ditch between the tracks.  Didn't know
> the word for it so tracks was the only thing I could think of.  I was
> thinking they were going to require subway systems to have the ditch
> between the tracks a certain depth, which they could conceivably do,
> or something equally stupid.
> 
> 
> If you were REALLY thinking only of new subway tracks, that's what you
> would have said.  if.
> 
> Stephanie
> 
> >
> >
> > --- In [email protected], "Stephanie Smilay"
> > <ssmilay@> wrote:
> > >
> > > On 1/7/07, Ray Bradley <clavenia@> wrote:
> > > > For the 12 or so miles that the DC Metro wants to extend out
towards
> > > > Dulles Airport, they are throwing around terms like "billions"
like
> > > > they  were on commission. I can only imagine how much that
would cost,
> > > > to dig out all the underground, high-water table Metro
stations that
> > > > already absorb ground and river water.
> > > >
> > > > I doubt anybody would put such a plan in action - hundreds of
millions
> > > > of dollars for something that might affect, what, 10, 20 people a
> > year?
> > > >
> > > > I think Stephanie is right in that it would be well-nigh
impossible to
> > > > implement on a city-wide scale; however, I think Ellen's
question will
> > > > be raised by lots of city and transportation planners, and
probably
> > > > implemented in newer station construction.
> > >
> > >
> > > Yeah, yeah, but that wasn't the bet.
> > >
> > > >
> > > > See? We're ALL winners here!
> > >
> > >
> > > Some more than others.
> > >
> > > Stephanie
> > >
> >
> >
> >
> >
> >
> > Yahoo! Groups Links
> >
> >
> >
> >
>


Reply via email to