CPE - PLUS a climber while it's being installed - Don't skimp Brian - I prob do more things out of specs then most - but that is b/c I add overkill into our tower bases....
 
JohnnyO
-----Original Message-----
From: [EMAIL PROTECTED] [mailto:[EMAIL PROTECTED] On Behalf Of Brian Rohrbacher
Sent: Monday, August 22, 2005 9:47 AM
To: WISPA General List
Subject: Re: [WISPA] Rohn BX Tower

I know.  On one hand I want it good enough for a CPE, but on the other hand I don't want to hear on the news 20 years from now that it crashed over and killed a guy when he wanted to put his VW Bug on top of it.  I want to build it to take whatever people want to put on it.

Scott Reed wrote:
Only a CPE today, but towers always beg for more equipment. Don't skimp, you never know what you will want/need in the future.

Scott Reed
Owner
NewWays
Wireless Networking
Network Design, Installation and Administration
www.nwwnet.net

---------- Original Message -----------
From: Brian Rohrbacher <[EMAIL PROTECTED]>
To: WISPA General List <wireless@wispa.org>
Sent: Mon, 22 Aug 2005 08:34:03 -0400
Subject: Re: [WISPA] Rohn BX Tower

> Portland cement has no gravel.  I'll mix it 4 parts to one.  So.....those 15 94 lb bags are like 60 94 lb bags.  I had figured I needed 1.28 yards for the hole I dug.  But now that I have the specs I will see how big the hole has to be.  I will only put a CPE on this tower.  Nothing huge.
>
> Brian
>
> Mark Koskenmaki wrote:
15 bags of cement won't mean squat in a hole that 

big.









North East Oregon Fastnet, LLC 

509-593-4061

personal correspondence to:  mark at neofast dot 

net

sales inquiries to:  purchasing at neofast dot 

net

Fast Internet, NO 

WIRES!

----------------------------------------------------------------------------

-

----- Original Message ----- 



From: "Brian Rohrbacher" <[EMAIL PROTECTED]>
To: <wireless@wispa.org>
Sent: Sunday, August 21, 2005 7:21 
PM
Subject: [WISPA] Rohn BX 
Tower

  
    
I dug a hole 32 inch square by 42 inches deep yesterday for a 

rohn 

bx

tower.  It is 5 sections of 8 ft.  I just got 15 bags of portland 

cement

    

      
and will add my own 

gravel.

  

    
I was thinking about three 1 1/2 inch pieces of pipe stuck in 

the 

concrete

    

      
to bolt the tower legs to.  I 

will

  

    
thread and put couplers on the pipe at 22 inches so they can't 

move.  

I've

    

      
got some re-bar to chuck down in the hole 

too.

  

    
I've got 3 8ft ground rods and will bond with #4 bare stranded 

wire.  

I

    

      
picked up a load of grade 8 

bolts,

  

    
washers, and lock washers for bolting the tower together and to 

the 

pipe

    

      
stubs.  Anyone have any 

suggestions

  

    
for me?  This is my first tower.  I will pour tomorrow 

afternoon.



brian





-- 



WISPA Wireless List: wireless@wispa.org

Subscribe/Unsubscribe:
http://lists.wispa.org/mailman/listinfo/wireless

Archives: http://lists.wispa.org/pipermail/wireless/
    
      
  

    

------- End of Original Message -------

No virus found in this incoming message. Checked by AVG Anti-Virus. Version: 7.0.338 / Virus Database: 267.10.13/78 - Release Date: 8/19/2005
-- 
WISPA Wireless List: wireless@wispa.org

Subscribe/Unsubscribe:
http://lists.wispa.org/mailman/listinfo/wireless

Archives: http://lists.wispa.org/pipermail/wireless/

Reply via email to